Oban 1 Berth Upgrades

A project to upgrade the infrastructure at the Oban 1 linkspan and adjacent slipway for new vessels being proposed to operate on routes from this berth.

About this project

The project aims to upgrade the infrastructure at the Oban 1 linkspan and adjacent slipway to support the requirements for new vessels being proposed for routes from this berth. The changes will ensure future resilience.

Contact us

To get in touch with us about this project, please email:

oban1berth@cmassets.co.uk

Latest news

Upcoming public events—Learn about our plans for the Oban 1 berth

Upcoming public events—Learn about our plans for the Oban 1 berth

We’re inviting communities to learn about our plans to upgrade the infrastructure at the ‘Oban 1’ linkspan and its adjacent slipway. These changes will support the requirements for new vessels being proposed for routes using this berth, and are designed to help ensure future resilience.

We will host both an in-person event in Oban, as well as an online virtual event, which will help ensure that stakeholders from all communities served by the Oban 1 berth and adjacent slipway have the opportunity to hear about this project and engage directly with the project team.

Event details

Date Location Event Venue Event Time Event Notes
Tuesday, 18 November 2025 Oban Oak Room
Rockfield Centre
Rockfield Brae
Oban
PA34 5DQ
16:00–19:00 This event is an in-person drop-in session. Please feel free to come along at any time convenient to you within the time window.
Thursday, 20 November 2025 Online Microsoft Teams 18:00–19:00 This event is an online session and will begin at the stated time.
Sign up to attend ›

What we’ll cover

Join us at the event to learn about the progress made so far in the outline design and consenting requirements of the project. Topics will include:

  • Enabling the Oban slipway to be used by the hybrid vessel class and the new Small Vessel Replacement Programme (SVRP) vessels.
  • Upgrading Oban 1 Berth, its linkspan, and approach structure to enable their usage by in-scope vessels.
  • The introduction of a new overnight berth for an SVRP or hybrid vessel, along with the required shore power facilities.
  • The work required to confirm the fit of the Passenger Access System (PAS) and recommendations to include an outline design for a new PAS.
  • The Harbour Revision Order and Marine Licence required to undertake the works, along with the steps being taken to provide an appropriate pre-application consultation.
  • Initial considerations and implications of disruption during construction.

How to attend

The in-person event in Oban is a drop-in session and requires no pre-registration. Please come along at a time that is convenient to you. Our project team will be on hand to answer any queries you may have.

To attend the online event, please register in advance. The meeting will take place using Microsoft Teams, and our project team will begin their presentation at 18:00.

Post-event presentation materials

Shortly after the events, we will publish the presentation materials on our project page for anyone who is unable to attend either in person or online.

Get in touch

We look forward to welcoming you to the event, but in the meantime, please do not hesitate to contact our project team at oban1berth@cmassets.co.uk with any questions.

You can find out more about this project at: https://cmal.scot/oban-1

New Project Overview: Upgrading Oban Harbour Infrastructure

New Project Overview: Upgrading Oban Harbour Infrastructure

Project Objectives

The project aims to upgrade the infrastructure at the Oban 1 linkspan and adjacent slipway to support the requirements for new vessels being proposed for routes from this berth. The changes will ensure future resilience.

The project will investigate, determine and develop a preferred design solution to accommodate;

  • Small Vessel Replacement Programme (SVRP) vessels and current hybrid vessels from the slipway
  • An overnight berth and appropriate charging facilities for SVRP and hybrid vessels
  • New Islay class Vessel (NIV) bow and stern-in
  • Interim Mull vessels bow and stern-in
  • New Mull Vessels (NMV) bow and stern-in

Project Timeline

The development of an outline business case commenced in February 2025 and will progress until spring 2026. During this period, our consultant, Royal Haskoning DHV, will be:

  • Gathering data and engaging stakeholders.
  • Conducting travel demand analysis.
  • Providing the outline design of a preferred option.
  • Commencing the potential consenting elements required, including a marine licence, HRO (Harbour Revision Order), dredging consent, and Environmental Impact Assessment (EIA).

More information will be provided as the project progresses. Engagement with local communities and key stakeholders will be undertaken via public information sessions in the coming months.

Contact Information

For additional details or inquiries, please contact us at oban1berth@cmassets.co.uk.

Stay tuned for further updates as we progress with this significant enhancement to Oban Harbour’s infrastructure at cmassets.co.uk/oban1berth.