NTM 73/21 Lochaline Ferry Terminal Ground Mooring Dive Project
Latitude 56º 32.247’N |
Longitude 005º 46.487’W |
WGS 84 Datum |
WGS 84 Datum |
Mariners are advised that on 06 October 2021 a dive project will be undertaken on the CalMac ferry ground mooring located at the north end of Lochaline Ferry Terminal pier, Loch Aline Channel, Sound of Mull.
Works are scheduled to be completed within 1-day and will be undertaken from the shore supported by a RIB workboat.
An A-Flag will always be displayed when divers are in the water. The dive supervisor will also maintain VHF communication on channel 16 and liaise with ferry masters and the local port manager to ensure there is no disruption to timetabled ferry services.
Mariners navigating through Loch Aline channel on this date are requested to do so with caution, regulate their speed to minimise the effects of wash and stay well clear of the workboat.
Further details can be obtained using the contact details below.
Issued on behalf of the Harbour Master
Caledonian Maritime Assets Limited
email: operations@cmassets.co.uk
Categories: Fios gu Maraichean
Tags: