NTM 66/20 BRODICK FERRY TERMINAL NEW PIER FENDER REPAIR AND INSPECTIONS
Latitude | 55º 34.686′ North (WGS-84 datum) |
Longitude | 005º 8.105′ West (WGS-84 datum) |
Mariners are advised that weather permitting, on 05 November 2020 repairs will be undertaken to a fender on the linkspan berth near to the head of the new pier at Brodick Ferry Terminal, Isle of Arran and a survey of fenders on the east side of the structure.
Works will be undertaken from the pier deck and are expected to be completed within two-days with no impact on timetabled ferry services.
All vessels navigating in the vicinity of the new pier at Brodick Ferry Terminal during this period are requested to do so with caution and maintain a lookout for the contractors. The berth they are working on will be closed to all vessels while they are suspended on the face of the fenders.
Further details can be obtained by using the contact details below.
David McHardie
Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ
Categories: Notice to Mariners, Piers and Harbours
Tags: