Complete

Latitude 55º 57.619′ North (WGS-84 datum)
Longitude 004º 48.835′ West (WGS-84 datum)

 

Mariners are advised that weather permitting, on 22 November 2019, contractors Shearwater will be conducting a diver survey on the linkspan at Gourock Ferry Terminal, Firth of Clyde.

The dive project will be undertaken from work boat MV Miner and Flag A “Diving Operations” will be displayed at all times when divers are in the water. The dive team supervisor will maintain liaison with the CalMac Harbour Manager and will monitor VHF channels 12 and 16 throughout the dive period.

During this time all vessels navigating in the vicinity of Gourock Ferry Terminal are requested to do so with caution, maintain a lookout for the workboats and regulate their speed to minimise the effects of wash.

Further details can be obtained using the contact details below:

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920


Categories: Fios gu Maraichean
Tags: