Complete NTM 46/21

Further to NTM 14/21, mariners are advised that CMAL will be conducting asset condition surveys of the facilities at the locations listed below that are operated primarily in support of lifeline ferries.

The surveys will be conducted by engineers operating from a small workboat. Unless otherwise indicated works should be completed within one day and will not disrupt scheduled ferry services.

Weather permitting, the surveys are scheduled to be undertaken on or about the following indicated dates.

07/06/21                    Isle of Harris, East Loch Tarbert, Tarbert Ferry Terminal

08 & 09/06/21           South Uist, Loch Boisdale, Lochboisdale Ferry Terminal

10/06/21                    Isle of Barra, Castle Bay, Castlebay Ferry Terminal

The workboat will maintain VHF communication on channel 16 and liaise with ferry masters and the local port manager.

Mariners navigating near to the abovenamed locations on the indicated dates are requested to do so with caution, regulate their speed to minimise the effects of wash and stay well clear of the workboat.

Further NTMs will be issued as the work progresses and details can be obtained using the contact details below.

 

Issued on behalf of the Harbour Master

Caledonian Maritime Assets Limited

email: operations@cmassets.co.uk


Categories: Fios gu Maraichean
Tags: