Complete NTM 45/20

Latitude 56° 32.223’ North (WGS-84 datum)
Longitude 005o 46.497’ West (WGS-84 datum)

In continuation of NTM 44/20, mariners are advised a further dive will be undertaken Lochaline Ferry Terminal, Morven, on 21 August 2020.

Works to remove debris from the ferry berthing area will be conducted from the slipway and pier structure and flag A ‘Diving Operations’ will be displayed at all times when divers are in the water. While the A Flag is displayed the pier will be closed to berthing by all vessels and the dive supervisor will maintain communication as required via VHF radio throughout the dive project.

Work is expected to be completed within 1-day.

All vessels navigating in the vicinity of Lochaline Ferry Terminal on the above date are requested to do so with caution, maintain a lookout for the dive team and regulate their speed to minimise the effects of wash accordingly during the period of the survey.

Further details can be obtained using the contact details below.

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920


Categories: Fios gu Maraichean
Tags: