NTM 30/19 Kennacraig Ferry Terminal Fender Repairs
Latitude | 55° 48.395’ North (WGS-84 datum) |
Longitude | 005o 29.070’ West (WGS-84 datum) |
Mariners are advised that repairs to damaged fendering on the south side of the outer pier dolphin at Kennacraig Ferry Terminal, West Loch Tarbert, Argyll will be undertaken from Monday 20 May 2019 and are estimated to last for 3 days.
Works will be supported by the workboat Dorus Mor and communication will be maintained by the vessel as necessary via VHF radio channel 16 throughout the repair period. Works will be conducted out with the scheduled ferry timetable to avoid any disruption to services.
During this time all vessels navigating in the vicinity of Kennacraig Ferry Terminal are requested to do so with caution, maintain a lookout for the workboat and regulate their speed to minimise the effects of wash accordingly.
Further details can be obtained using the contact details below David McHardie Tel: 01475 749 920 Email: info@cmassets.co.uk
|
Categories: Fios gu Maraichean
Tags: