Complete NTM 18/20

Latitude 56º 32.223′ North (WGS-84 datum)
Longitude 005º 46.497′ West (WGS-84 datum)

Mariners are advised that as part of ongoing construction works contractors are required to undertake a dredging operation at Lochaline Ferry Terminal.

Weather permitting, work will begin on 09 March 2020 and be completed on or around 15 March 2020. Work will be carried out by Dredger MV Shearwater.

Barge Agem 1 will also remain at Lochaline for the duration of the works.

 

The vessel’s Master will monitor communications on VHF channel 16.

All vessels navigating in the vicinity of Lochaline ferry terminal during this time are advised to maintain a look-out for the dredger, proceed with caution and regulate their speed to minimise the effects of wash accordingly.

Further details can be obtained using the contact details below

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920


Categories: Notice to Mariners
Tags: