-
This NTM provides mariners with guidance on the procedures, accountability and monitoring of bunkering operations within Caledonian Maritime Assets Limited (CMAL) harbours and other marine facilities.
-
The chosen course for RoRo ferries, other large commercial vessels or cruise ships approaching or departing Caledonian Maritime Assets Ltd ports is primarily determined by the prevailing weather condi
-
COMMERCIAL DIVE PROJECTS Commercial Diving Operations carried out in harbours and other areas within the jurisdiction of Caledonian Maritime Assets Ltd are conducted in strict compliance with the “Div
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven has been repaired and the outfit is now displ
-
Further to NTM 03/16 mariners are advised contractor North West Marine Ltd have lifted the existing walkway structure from between the inner and outer dolphin structures at Lochaline Ferry Terminal, M
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven is extinguished. Details are as follows: Loca
-
Mariners are advised that the rear leading AtoN light located on the linkspan lifting dolphin at Gott Bay Ferry Terminal Pier, Scaranish, Tiree is extinguished. Details are as follows: Location descri
-
Mariners are advised that a recent inspection has discovered inaccuracies in all light sectors of Sgeir Ghlas sector navigation light. Following an inspection by NLV Pharos it has been reported the so
-
Mariners are advised contractor North West Marine Ltd are undertaking marine works which will include: removal by lifting and dismantling of the existing walkway structure between the Inner and Outer
-
Mariners are advised that many large vessels (20m or more in length) and in particular RoRo ferries operating within the approaches to Lochboisdale Ferry Terminal are ‘vessels constrained by their dra
-
Mariners are advised that all Caledonian Maritime Assets Limited NTMs issued prior to today’s date are cancelled, or considered sufficiently promulgated. All new NTMs will be issued or those remaining
-
Presentation and Stakeholder notes from the recent public meeting at Brodick held on 3rd December are availble below: Brodick Public Presentation 03 Dec 2015 (PDF, 12.8mb) Brodick Redevelopment Stakeh
-
A cutting edge ferry, which is the third of three unique ‘hybrid’ vessels, was launched on the Clyde today at Ferguson Marine Engineering Ltd’s (FMEL) shipyard in Port Glasgow. The hybrid ferry, named
-
Caledonian Maritime Assets Ltd (CMAL) have now awarded the contract to redevelop the Brodick Ferry Terminal, and would like to update local individuals, groups and businesses on the project, as well a
-
The Chief Executive Officer of Caledonian Maritime Assets Limited (CMAL) will leave in April 2016 after two years leading the organisation. Tom Docherty, who joined CMAL in April 2014, is leaving to p
-
Caledonian Maritime Assets Limited (CMAL) has completed the £1 million comprehensive upgrade of the Grade A listed building that forms the Wemyss Bay Ferry Terminal. The existing timber walkway, ticke
-
The contract to transform the ferry terminal in Brodick has been awarded to George Leslie Limited by Caledonian Maritime Assets Limited (CMAL). The contract is worth over £22.2 million and is part of
-
The Scottish Transport Minister announced the build and design two new ferries for use on the Clyde and Hebrides Ferry Services.
-
Caledonian Maritime Assets Ltd (CMAL) has appointed a contractor to undertake essential groundworks at Brodick Ferry Terminal, in advance of the main redevelopment project. These works are due to star
-
Below are questions/issues raised during public communication meetings in relation to refurbishment works at Wemyss Bay on Tuesday 15th September 2015. Wemyss Bay Project Q and A September 15, Click t