This NTM provides mariners with guidance on the procedures, accountability and monitoring of bunkering operations within Caledonian Maritime Assets Limited (CMAL) harbours and other marine facilities.
-
The chosen course for RoRo ferries, other large commercial vessels or cruise ships approaching or departing Caledonian Maritime Assets Ltd ports is primarily determined by the prevailing weather condi
-
COMMERCIAL DIVE PROJECTS Commercial Diving Operations carried out in harbours and other areas within the jurisdiction of Caledonian Maritime Assets Ltd are conducted in strict compliance with the “Div
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven has been repaired and the outfit is now displ
-
Further to NTM 03/16 mariners are advised contractor North West Marine Ltd have lifted the existing walkway structure from between the inner and outer dolphin structures at Lochaline Ferry Terminal, M
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven is extinguished. Details are as follows: Loca
-
Mariners are advised that the rear leading AtoN light located on the linkspan lifting dolphin at Gott Bay Ferry Terminal Pier, Scaranish, Tiree is extinguished. Details are as follows: Location descri
-
Mariners are advised that a recent inspection has discovered inaccuracies in all light sectors of Sgeir Ghlas sector navigation light. Following an inspection by NLV Pharos it has been reported the so
-
Mariners are advised contractor North West Marine Ltd are undertaking marine works which will include: removal by lifting and dismantling of the existing walkway structure between the Inner and Outer
-
Mariners are advised that many large vessels (20m or more in length) and in particular RoRo ferries operating within the approaches to Lochboisdale Ferry Terminal are ‘vessels constrained by their dra
-
Mariners are advised that all Caledonian Maritime Assets Limited NTMs issued prior to today’s date are cancelled, or considered sufficiently promulgated. All new NTMs will be issued or those remaining
-
Please note diving operations are planned to be undertaken by North West Marine at Lochranza Ferry Terminal between Monday 23rd – Friday 27th November. The divers will set up their diving equipment on
-
Mariners are advised contractor North West Marine Ltd are undertaking marine works which will include: removal by lifting and dismantling of the existing walkway structure between the Inner and Outer
-
Mariners are advised that weather permitting, repair works will commence at Oban Ferry Terminal Linkspan no. 1 berth at 0700hrs Monday 16th November 2015 and are programmed to be completed by 0700hrs
-
With reference to NTM 51/15 mariners are advised that repairs to the mooring gear of the navigation buoy at Braigh Mor, East Loch Tarbert, Isle of Harris are complete and the buoy has been returned to
-
With reference to NTM 43/15 mariners are advised the outer Port Ellen Shoal Buoy has been returned to station. The aforementioned NTM is now cancelled. Please click here to download a printable PDF of
-
Mariners are advised that Caledonian Maritime Assets Ltd have established a new lit starboard hand buoy to mark the edge of the shoal within the inner harbour approaches at Port Ellen, Isle of Islay.
-
Mariners are advised that a routine maintenance inspection has identified a critical defect on the mooring gear of the navigation buoy at Braigh Mor, East Loch Tarbert, Isle of Harris. This has requir
-
Mariners are advised contractor Lanarkshire Welding Company Limited is undertaking maintenance and repair works to Gourock Ferry Terminal linkspan. Weather permitting, works are programmed to commence
-
Mariners are advised contractor George Leslie Ltd is installing timber rubbing strips to the front of the berthing steps platforms located adjacent to Gourock Ferry Terminal linkspan and painting work