-
Latitude 56° 30.610’N Longitude 006° 47.837’W WGS 84 Datum WGS 84 Datum Mariners are advised that weather permitting pier escape ladder installation works will be taking place at Tiree Ferry Te
-
Mariners are advised the following AtoN light located in the inner harbour of Loch Boisdale, South Uist has been repaired and is now operating as sanctioned. Details are as follows: Location descripti
-
Mariners are advised the lower light of the following AtoN light located on the pier head at Lochranza, Isle of Arran is extinguished. Details are as follows: Location description Loch Ranza. F
-
Mariners are advised the following AtoN light located on the north shore of East Loch Tarbert, Isle of Harris is extinguished. Details are as follows: Location description East Loch Tarbert, Ru
-
Mariners are advised the following AtoN light located in the inner harbour of Loch Boisdale, South Uist is extinguished. Details are as follows: Location description Lochboisdale. Eilean Dubh (
-
Latitude: 56º 41’N Longitude: 06º 06’W Mariners are advised that contractors Shearwater Marine Services Ltd will be carrying out dive surveys, weather permitting on 23rd & 2
-
Latitude 55° 55.357’N Longitude 005° 9.207’W WGS 84 Datum WGS 84 Datum With reference to NTM 54/17, mariners are advised that contractors Raynesway Construction Ltd will have ‘MV Challenger of
-
Latitude 55° 55.393’N Longitude 005° 9.163’W WGS 84 Datum WGS 84 Datum With reference to NTM 53/17, mariners are advised that contractors Raynesway Construction Ltd will have ‘MV Hound Voyager’ workbo
-
Latitude 55° 55.393’N Longitude 005° 9.163’W WGS 84 Datum WGS 84 Datum With reference to NTM 44/17, mariners are advised that contractors Raynesway Construction Ltd will have ‘MV Challenger of
-
Latitude 55° 57.618’N Longitude 004° 48.856’W WGS 84 Datum WGS 84 Datum Mariners are advised that on Monday 09 October 2017, contractors GSS (Plant) Ltd will commence works to repair and upgrad
-
Latitude 56° 57.226’N Longitude 007° 29.293’W WGS 84 Datum WGS 84 Datum Mariners are advised that, weather permitting a visual inspection of Castlebay Ferry Terminal Pier, Isle of Barra will be
-
Mariners are advised that following resolution of yesterday’s technical difficulties, about 12:00hrs today dive contractors CCD are undertaking a dive project to inspect the CalMac RoRo ferry MV Loch
-
In continuation of NTM 48/17 issued a short time ago, mariners are advised that due to technical reasons this dive and the aforementioned NTM are now cancelled until further notice. Further details ca
-
Mariners are advised that about 12:00hrs today, dive contractors Shearwater Marine Services Ltd are undertaking a dive project to inspect the CalMac RoRo ferry MV Loch Tarbert while alongside the Mish
-
Between 20:00 and 21:15 on Saturday 9 September 2017, the Viking Festival of Fire will take place at Cairnie’s Quay, Largs. Weather permitting the event will culminate in a firework display commencing
-
Mariners are advised that works to complete an inspection of the pier deck at Tarbert Ferry Terminal, Isle of Harris will be undertaken from 24 August 2017. CMAL’s contractor Charles Darley Associates
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting a hydrographic survey of the CMAL harbour area at Kennacraig Ferry Terminal, West Loch Tarbert. The
-
Mariners are advised that contractors Raynesway Construction Ltd have commenced reconstruction of the ferry slipways and marshalling areas at Colintraive and Rhubodach Ferry Slipway, Kyles of Bute. We
-
Mariners are advised that contractors will be installing pontoons and floating attenuator within the inner harbour of East Loch Tarbert, Tarbert, Isle of Harris. Weather permitting works are scheduled
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting hydrographic surveys of the CMAL harbour area at Largs Ferry Terminal, and an area adjacent to Cumbr