-
Location description Lochaline ferry berthing area Latitude 55º 52.555’N WGS 84 Datum Longitude 04º 53.497’W WGS 84 Datum Mariners are advised that weather permitting a condition survey of pier and li
-
Caledonian Maritime Assets Ltd (CMAL) has awarded a contract to Wallace Stone Consulting Engineers for design development work in advance of the introduction of a new ferry on the ‘Skye Triangle’ in 2
-
Essential repair work at Port Ellen Ferry Terminal will require ferry operator CalMac to divert all Islay services to Port Askaig for a period of around three weeks. CMAL is replacing the port’s link
-
Please note this week’s “drop in” session as previously scheduled for Thursday, 3rd March has been postponed. The session has been rescheduled for Thursday 10th of March, 6pm in the Green Tree Room at
-
Presentation delivered by Alistair Chan, our Civil Engineer at the Lochaline Stakeholder Engagement/Public meeting, 7:00pm on 26th January at the Lochaline Village Hall Click below to download a PDF c
-
Presentation by Ruairidh Campbell of CMAL delivered to Colintraive and Glendaruel Community Council on Monday, 15th February, 2016 at 7.30 pm held at Colintraive Village Hall. Click here to download t
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting a hydrographic survey of the CMAL harbour area at Gourock Ferry Terminal, Gourock Bay, Firth of Clyd
-
Mariners are advised that contractors George Leslie Ltd will soon be commencing reconstruction of Brodick Ferry Terminal, Isle of Arran. On-shore site setup commenced on 11th January 2016 and weather
-
Mariners are advised that East Loch Tarbert, Harris, Sgeir Bhuidhe light A3994.16 has been repaired and the outfit is now displaying to character. Subsequently, NTM 10/16 is now cancelled. Further det
-
Mariners are advised the following lower AtoN light located on the pier head of Castlebay Ferry Terminal, Isle of Barra is extinguished. Details are as follows: Location description : Vatersay Sound.
-
Mariners are advised that Lochboisdale Ferry Terminal, South Uist, Directional Light A4009.9 has been repaired and the outfit is now displaying to character. Subsequently, NTM 12/16 is now cancelled.
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting a hydrographic survey of the CMAL harbour area at Lochboisdale Harbour, South Uist. The survey is pl
-
Mariners are advised the following AtoN light located at Lochboisdale Ferry Terminal, South Uist is extinguished. Details are as follows: Location description : Lochboisdale. Ferry Terminal Dir Lt 294
-
Mariners are advised that major internal building refurbishment works are about to commence at Largs Ferry Terminal. Works will commence at 0800hrs Wednesday 13th January 2016 and are scheduled to be
-
Mariners are advised the following AtoN light located on the south shore of East Loch Tarbert, Isle of Harris is extinguished. Details are as follows: Location description : East Loch Tarbert, Sgeir B
-
Mariners are advised contractor George Leslie Ltd will be undertaking marine works in the Sound of Kerrera which will include: Extension to Gallanach Ferry Slipway including erection of a 20m temporar
-
Safe Speed Masters of any vessels navigating within CMAL harbours are advised to navigate the vessel with care and caution, appropriate for local circumstances and conditions and in such manner as not
-
This NTM provides mariners with guidance on the procedures, accountability and monitoring of bunkering operations within Caledonian Maritime Assets Limited (CMAL) harbours and other marine facilities.
-
COMMERCIAL DIVE PROJECTS Commercial Diving Operations carried out in harbours and other areas within the jurisdiction of Caledonian Maritime Assets Ltd are conducted in strict compliance with the “Div
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven has been repaired and the outfit is now displ