NTM 15/21 Lochranza Ferry Terminal Slipway Repairs Update
Latitude 55° 42.480’ North Longitude 005° 18.081’ West
WGS 84 Datum WGS 84 Datum
With reference to NTM 11/21, mariners are advised that due to the impact of the continuing unfavourable weather conditions the slipway repairs at Lochranza Ferry Terminal, Isle of Arran are behind schedule and will continue for approximately the next 14 days.
Further details can be obtained using the contact details below.
Issued on behalf of the Harbour Master
Caledonian Maritime Assets Limited
email: operations@cmassets.co.uk
Categories: Fios gu Maraichean
Tags: