Complete NTM 25-20

Latitude 56º 32.223′ North (WGS-84 datum)
Longitude 005º 46.497′ West (WGS-84 datum)

Mariners are advised that commencing on 19 May 2020 works will be undertaken to remove underwater obstructions around the slipway and approaches at Lochaline Ferry Terminal, Morvern.

Works will be conducted from the slipway and will involve a long reach excavator and a dive project.  Flag A ‘Diving Operations’ will be displayed at all times when divers are in the water, during which times the pier and slipway will be closed to berthing by all vessels. The dive supervisor will maintain communication as required via VHF radio throughout the dive project.

Work is expected to be completed within two days.

All vessels navigating in the vicinity of Lochaline Ferry Terminal during this time are requested to do so with caution, maintain a lookout for the dive team and regulate their speed to minimise the effects of wash accordingly.

Further details can be obtained using the contact details below

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920


Categories: Fios gu Maraichean
Tags: