NTM 08/22 Oban Railway Pier No. 1 Linkspan Berth, Fender Repairs
Latitude 56º 24.717’N | Longitude 005º 28.625’W |
WGS 84 Datum | WGS 84 Datum |
Mariners are advised that later today, 17 January 2022, fender repair works will be undertaken at No. 1 linkspan berth, Railway Pier, Oban Ferry Terminal.
Works are scheduled to be completed within 2-days and will be conducted from the shore and the workboat Dorus Mhor.
The works supervisor will liaise with ferry masters and the local port manager to ensure there is no disruption to timetabled ferry services and during the works the workboat will maintain a radio watch on channels 12 and 16.
Mariners navigating through Oban Bay in the vicinity of the ferry terminal during this time are requested to do so with caution, regulate their speed to minimise the effects of wash and stay well clear of No. 1 linkspan berth when the workboat is alongside.
Further details can be obtained using the contact details below.
Issued on behalf of the Harbour Master
Caledonian Maritime Assets Limited
email: operations@cmassets.co.uk
Categories: Fios gu Maraichean
Tags: