-
We announce the names for the two new ferries
-
We confirm the total cost of the KC investigation
-
Equipment to be installed 7 January 2024
-
Setting sail for Net Zero—ferries have been converted to accept shore power and will ‘plug-in’ at Aberdeen
-
The public vote has launched to name the two new vessels for the…
-
The Ground Investigation works for the proposed new ferry terminal at Port Ellen have been completed successfully
-
We are pleased to announce an upcoming face-to-face drop-in session for the Mallaig-Lochboisdale New Vessel project
-
Enabling works are required at Kennacraig in preparation for the…
-
CMAL is hosting two public engagement sessions…
-
The full response given to the BBC ahead of the story published
-
King’s Counsel report is now available to read in full
-
Updates on Colonsay, Kennacraig and Port Askaig ferry terminals
-
Minister for Transport Fiona Hyslop was in Tarbert (Harris) yesterday to officially open the multi million-pound Tarbert ferry terminal project, led by Caledonian Maritime Assets Limited (CMAL). Ms. H
-
Two new CMAL ferries being built for the Little Minch routes have met milestones.
-
The Ground Investigation works for the proposed new ferry terminal at Port Ellen have been completed successfully
-
The sister vessel to MV Glen Sannox will be named MV Glen Rosa following a landslide win in a public vote Caledonian Maritime Assets Limited (CMAL) has announced that the vessel currently known as Hul
-
We are hosting a series of in-person public engagement events
-
We need your help to name Hull 802
-
CMAL has built a new shelter facility at Tiree
-
A programme of ground investigation work is set to begin