-
In continuation of NTM 17/16 mariners are advised that during the morning of 27th February 2016 sub-contractor Coastworks Operations Ltd will mobilise two workboats and a crane barge to Brodick Ferry
-
Mariners are advised on Friday 26th February 2016, dive contractors Shearwater Marine Services Ltd will commence a dive project at Brodick Ferry Terminal, Isle of Arran to: Survey the existing ferry t
-
Presentation delivered by Alistair Chan, our Civil Engineer at the Lochaline Stakeholder Engagement/Public meeting, 7:00pm on 26th January at the Lochaline Village Hall Click below to download a PDF c
-
Mariners are advised that the lower AtoN light located on the pier head of Castlebay Ferry Terminal, Isle of Barra has resumed operation and the outfit is now displaying to character. Subsequently, NT
-
Caledonian Maritime Assets Ltd (CMAL) has announced the appointment of their new Chief Executive Officer, Kevin Hobbs. Kevin, who currently owns a ports, marine logistics and shipping consultancy, ha
-
The steel cutting ceremony took place at FMEL shipyard in Port Glasgow, where the ships are being built.
-
Presentation by Ruairidh Campbell of CMAL delivered to Colintraive and Glendaruel Community Council on Monday, 15th February, 2016 at 7.30 pm held at Colintraive Village Hall. Click here to download t
-
Mariners are advised that a report has been received of damage caused to a vessel berthed on the quayside at Port Beag Slipway, South Quay, Oban. The location is indicated by the red circled area belo
-
Two 100-metre vessels to be built on the Clyde. The Minister for Transport and Islands has marked the formal start of construction of two new 100-metre ferries for the Clyde and Hebrides network at Fe
-
Steel was cut today for Caledonian Maritime Assets Ltd’s two new ferries being built by Ferguson Marine Engineering Ltd (FMEL), marking the start of construction on the £97 million vessels. The steel-
-
CMAL met with Community Councillors in North Uist this month to deliver a presentation on the two new 100 metre dual fuel ferries. A copy of the presentation is available here (Powerpoint 3mb). The f
-
Progress Update No. 4 8th February 2016 Wemyss Bay Pier Refurbishment-Progress Update No 4 (PDF, 875Kb) For ‘Progress Update No.1, please click here (PDF, 820kb) For ‘Progress Update No.2, please clic
-
Further to NTM 47/15 mariners are reminded that as a result of damage caused to fendering on Mingary Pier, Kilchoan, Ardnamurchan the pier remains closed to all vessels until further notice to prevent
-
The first meeting of the Ardrossan Harbour Taskforce has been convened by Minister for Transport and Islands, Derek Mackay. The group, which is made up of all of the harbour’s key stakeholders, has be
-
Questions / comments raised at all CMAL public meeting regarding Brodick Ferry Terminal redevelopment. Download the PDF by clicking here (PDF, 1.7mb)
-
With reference to NTM 20/16, mariners are advised that on Tuesday 02 February 2016, weather permitting GSS (Plant) Ltd will be undertaking a second dive project to remove displaced rocks near to the t