Mariners are advised that weather permitting an inspection of the quayside infrastructure at Gourock Ferry Terminal, Firth of Clyde will be undertaken on Wednesday 27th January 2016. CMAL’s consulting
-
Mariners are advised that on Tuesday 26th January 2016 GSS (Plant) Ltd is undertaking a dive project to remove displaced rocks near to the toe of the Portavadie Ferry Slipway, Loch Fyne. To ensure the
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting hydrographic surveys of the CMAL harbour area at Largs Ferry Terminal, and an area adjacent to Cumbr
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting a hydrographic survey of the CMAL harbour area at Gourock Ferry Terminal, Gourock Bay, Firth of Clyd
-
Mariners are advised that contractors George Leslie Ltd will soon be commencing reconstruction of Brodick Ferry Terminal, Isle of Arran. On-shore site setup commenced on 11th January 2016 and weather
-
Mariners are advised that East Loch Tarbert, Harris, Sgeir Bhuidhe light A3994.16 has been repaired and the outfit is now displaying to character. Subsequently, NTM 10/16 is now cancelled. Further det
-
Mariners are advised the following lower AtoN light located on the pier head of Castlebay Ferry Terminal, Isle of Barra is extinguished. Details are as follows: Location description : Vatersay Sound.
-
Mariners are advised that Lochboisdale Ferry Terminal, South Uist, Directional Light A4009.9 has been repaired and the outfit is now displaying to character. Subsequently, NTM 12/16 is now cancelled.
-
Mariners are advised that contractors Aspect Land & Hydrographic Surveys Ltd will be conducting a hydrographic survey of the CMAL harbour area at Lochboisdale Harbour, South Uist. The survey is pl
-
Mariners are advised the following AtoN light located at Lochboisdale Ferry Terminal, South Uist is extinguished. Details are as follows: Location description : Lochboisdale. Ferry Terminal Dir Lt 294
-
Mariners are advised that major internal building refurbishment works are about to commence at Largs Ferry Terminal. Works will commence at 0800hrs Wednesday 13th January 2016 and are scheduled to be
-
Mariners are advised the following AtoN light located on the south shore of East Loch Tarbert, Isle of Harris is extinguished. Details are as follows: Location description : East Loch Tarbert, Sgeir B
-
Mariners are advised contractor George Leslie Ltd will be undertaking marine works in the Sound of Kerrera which will include: Extension to Gallanach Ferry Slipway including erection of a 20m temporar
-
Progress Update No. 3 8th January 2016 Wemyss Bay Pier Refurbishment-Progress Update No 3 (PDF, 831Kb) For ‘Progress Update No.1, please click here (PDF, 820kb) For ‘Progress Update No.2, please click
-
Safe Speed Masters of any vessels navigating within CMAL harbours are advised to navigate the vessel with care and caution, appropriate for local circumstances and conditions and in such manner as not
-
This NTM provides mariners with guidance on the procedures, accountability and monitoring of bunkering operations within Caledonian Maritime Assets Limited (CMAL) harbours and other marine facilities.
-
The chosen course for RoRo ferries, other large commercial vessels or cruise ships approaching or departing Caledonian Maritime Assets Ltd ports is primarily determined by the prevailing weather condi
-
COMMERCIAL DIVE PROJECTS Commercial Diving Operations carried out in harbours and other areas within the jurisdiction of Caledonian Maritime Assets Ltd are conducted in strict compliance with the “Div
-
Mariners are advised that the red sector of the Lochaline directional light AtoN light located on the west shore north of Lochaline Ferry Terminal, Morven has been repaired and the outfit is now displ
-
Further to NTM 03/16 mariners are advised contractor North West Marine Ltd have lifted the existing walkway structure from between the inner and outer dolphin structures at Lochaline Ferry Terminal, M